نتایج جستجو برای: Multi-Choice Goal Programming

تعداد نتایج: 1134980  

Journal: :Applied Mathematical Modelling 2012

Journal: :Applied Mathematical Modelling 2008

Journal: :پژوهش های نوین در تصمیم گیری 0
فاطمه عباسی کارشناس ارشد مدیریت صنعتی ، موسسه آموزش عالی کار، قزوین، ایران. اکبر عالم تبریز استاد، گروه مدیریت صنعتی، دانشکده مدیریت و حسابداری، دانشگاه شهید بهشتی، تهران، ایران

location selection is one of the most important activities in establishment of bank branches. choosing a suitable location have a direct impact on the performance of banks and also facilitating the achievement of other objectives. there are a lot of influential factors on the location selection which are complicated and therefore the traditional methods cannot be used. so we need to have a suit...

Journal: :iranian journal of fuzzy systems 2005
m. a. yaghoobi m. tamiz

a theorem was recently introduced to establish a relationship betweengoal programming and fuzzy programming for vectormaximum problems.in this short note it is shown that the relationship does not exist underall circumstances. the necessary correction is proposed.

Journal: :European Journal of Operational Research 2011
Ching-Ter Chang

0377-2217/$ see front matter 2011 Elsevier B.V. A doi:10.1016/j.ejor.2011.06.041 ⇑ Tel.: +886 920884730. E-mail address: [email protected] Goal programming (GP) has been, and still is, the most widely used technique for solving multiple-criteria decision problems and multiple-objective decision problems by finding a set of satisfying solutions. However, the major limitation of goal progr...

Journal: :international journal of industrial engineering and productional research- 0
seyed jafar sadjadi dept. industrial engineering, iran university of science and technology, tehran, iran amin alinezhad esboei dept. industrial engineering, iran university of science and technology, tehran, iran

the problem of staff scheduling at a truck hub for loading and stripping of the trucks is an important and difficult problem to optimize the labor efficiency and cost. the trucks enter the hub at different hours a day, in different known time schedules and operating hours. in this paper, we propose a goal programming to maximize the labor efficiency via minimizing the allocation cost. the propo...

Sankar Kumar Roy Sumit Kumar Maiti

In this paper, a Multi-Choice Stochastic Bi-Level Programming Problem (MCSBLPP) is considered where all the parameters of constraints are followed by normal distribution. The cost coefficients of the objective functions are multi-choice types. At first, all the probabilistic constraints are transformed into deterministic constraints using stochastic programming approach. Further, a general tran...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید